dc.descriptionProyecto de Graduación (Licenciatura en Ingeniería en Mantenimiento Industrial) Instituto Tecnológico de Costa Rica, Escuela de Ingeniería Electromecánica, 2016.es
dc.description.abstractThe execution of this reshuffle will take place in Escalante Pradilla Hospital Dr. Fernando Pérez Zeledón. This is done in order to adapt the electrical design of hospital infrastructure extensions.The system consists of a network of overhead power distribution and other underground. The medium voltage network of 34.5 KV hospital requires the installation of two new transformers for the new burdens that are needed in the Emergency Service. Installing new building loads Emergency strengthen the system requires medium voltage equipment demand. The second part of the project consists of a montage of underground lines that are within the hospital. This network of underground medium voltage must reach an internal substation and then derived three transformers to feed pedestal. For better understanding the needs of the hospital, an analysis of the current situation of medium voltage system feeding the hospital is done. This allows to analyze and understand the existing aerial installation that feeds the hospital. The underground distribution will be installed in its new majority. Then a layout design and assembly of the posts forming the airlines is performed. In the same way the calculations are set to pay underground medium voltage distribution transformers that feed. The budget that the project requires for its implementation, which corresponds to US $ 81,000 triphasic. This includes airlines, the air transition, underground lines.This cost is presented in order to justify the construction of the work that needs Hospital.es
dc.description.sponsorshipInstituto Tecnológico de Costa Rica.es
dc.language.isospaes
dc.publisherInstituto Tecnológico de Costa Ricaes
dc.subjectMontajees
dc.subjectMedia tensiónes
dc.subjectLínea aéreaes
dc.subjectLínea subterráneaes
dc.subjectTransformadores
dc.titleRemodelación de la red de distribución eléctrica de media tensión para el servicio de urgencias del Hospital Dr. Fernando Escalante Pradillaes