Tecnológico de Costa Rica
  • ¿Cómo publicar en el Repositorio TEC?
  • Políticas
  • Recursos Educativos
  • Contáctenos
    • español
    • English
  • español 
    • español
    • English
  • Login
Ver ítem 
  •   Página Principal
  • Trabajos de Graduación
  • Campus Tecnológico Local San Carlos
  • Carrera de Ingeniería en Computación
  • Bachillerato en Ingeniería en Computación
  • Ver ítem
  •   Página Principal
  • Trabajos de Graduación
  • Campus Tecnológico Local San Carlos
  • Carrera de Ingeniería en Computación
  • Bachillerato en Ingeniería en Computación
  • Ver ítem
JavaScript is disabled for your browser. Some features of this site may not work without it.

Listar

Todo el RepositorioComunidades & ColeccionesPor fecha de publicaciónAutoresTítulosPalabras clavesTipo de Recurso EducativoDestinatarioEsta colecciónPor fecha de publicaciónAutoresTítulosPalabras clavesTipo de Recurso EducativoDestinatario

Mi cuenta

AccederRegistro

Estadísticas

Ver Estadísticas de uso

Gestión del " Capabillity maturity model integration" (CMMI) Nivel 3 y de la norma ISO 25001 en la empresa Novacomp S.A.

Thumbnail
Ver/
capabillity_maturity_model_integration.pdf (1.021Mb)
Fecha
2017
Autor
Campos-Chavarria, Dolger Gerardo
Metadatos
Mostrar el registro completo del ítem
Resumen
The following document will explain in detail the final report corresponding to the course of Professional Practice (IC8842) of the Computer Engineering Career at Instituto Tecnológico de Costa Rica, San Carlos Headquarters. This practice is being carried out in the company Novacomp S.A. in the project: Management of the “Capability Maturity Model Integration” (CMMI) level 3 and ISO 25001. There is a need identified during this process, to systematize the management of projects, enabling a model that enables, executes, and delivers tangible results in established time periods. This study parts from the best practices for project management to identify known methodologies for such, and wraps up with workflows, templates and tools that allow for the execution of continuous improvement projects. During the first stage of the project, the organization’s current situation and gap analysis was performed, measuring against the CMMI maturity model. In brief, it was determined an execution urgency derived in project’s documentation and planning misses. This reinforced negatively on process gaps, lack of objective estimations including risk assessments, failures in scope definition and quality assurance, among others. The proposed solution contains a new work structure, focused in efficiency and effectiveness. It includes a new workflow to initiate, plan, execute, monitor, control and close continuous improvement projects. It also relies on new custom templates and tools, being the minimum required documentation to complete the proposed activities.
Descripción
Informe final de práctica de especialidad (Bachillerato en Ingeniería en Computación) Instituto Tecnológico de Costa Rica, Escuela de Ingeniería en Computación, 2017.
URI
https://hdl.handle.net/2238/7316
Compartir
       
Métricas
Colecciones
  • Bachillerato en Ingeniería en Computación [122]

|Contáctenos

Repositorio Institucional del Tecnológico de Costa Rica

Sistema de Bibliotecas del TEC | SIBITEC

© DERECHOS RESERVADOS. Un sitio soportado por DSpace(v. 6.3)

RT-1

 

 


|Contáctenos

Repositorio Institucional del Tecnológico de Costa Rica

Sistema de Bibliotecas del TEC | SIBITEC

© DERECHOS RESERVADOS. Un sitio soportado por DSpace(v. 6.3)

RT-1