Plan de Gestión de Riesgos Proyecto Hidroeléctrico Capulín-San Pablo
(Instituto Tecnológico de Costa Rica, 2015)
This document corresponds to the development of a risk management plan for the Hydroelectric Project Capulín - San Pablo. Through which the current situation of the company in risk management was analyzed in order to ...
Ejecución de la construcción del reforzamiento del edificio del centro comercial Plaza Wong
(Instituto Tecnológico de Costa Rica, 2016)
This final graduation project entitled
"Implementation of the construction of the
reinforcement of the building of the Plaza Wong
shopping center" is an informative document
about the construction process necessary to ...
Implementación de la filosofía Lean en la producción de concreto con autohormigonera
(Instituto Tecnológico de Costa Rica, 2017)
The following investigation seeks the Lean
philosophy implementation on the concrete
production process with a self-propelled mixer,
developing a methodology that involves Lean
tools.
At the beginning, the necessary ...
Diseño de un plan de gestión de calidad e inspección en la construcción de subestaciones eléctricas
(Instituto Tecnológico de Costa Rica, 2011)
This document contains the design of a System of
Quality Control and Inspection in the Construction
of Electrical Substations for the Instituto
Costarricense de Electricidad, especially for
Strategic Business Unit ...
Metodología para la administración de los materiales de la Constructora Adelante Desarrollos S.A.
(Instituto Tecnológico de Costa Rica, 2017)
The following report presents a proposal of improvement to the administration and use of the materials in the construction Company Adelante Desarrollos S.A. We choose three types of housing as an object of study, which ...
Factores que afectan la construcción de alcantarillado sanitario para la Constructora Fernández Vaglio S.A.
(Instituto Tecnológico de Costa Rica, 2018)
The work presented below is based on the determination of factors that affect the construction of a sanitary pipeline project, to propose tools and methods to be able to reduce the elements identified to the maximum. To ...
Implementación del software O4B en la gestión de control de proyectos en la Unidad Técnica de Gestión Vial de la Municipalidad de Osa
(Instituto Tecnológico de Costa Rica, 2017)
The implementation project of the Open for Business software "O4B" in the Municipality of Osa consists of applying this program in the control of road projects, using information from the projects that were being executed, ...
Aplicación de Lean Construction a través de la metodología Last Planner a proyectos de vivienda social de FUPROVI
(Instituto Tecnológico de Costa Rica, 2017)
The present paper consists on the final report of the graduation project, which consisted on designing the procedure for the application of Last Planner System® (LPS) and perform a pilot application on a project under ...
Monitoreo y control de la aplicación del procedimiento 8P02 Proyectos y adecuación de espacios del sistema de Gestión de Calidad de Los Arallanes S.A, según la norma ISO 9001 – 2015, en los procesos constructivos.
(Instituto Tecnológico de Costa Rica, 2018)
Quality management and the implementation of project management in construction companies are key for success, since it proves that the industry can generate products and / or services that meet customer requirements. ...
Control de costos en edificio de tres niveles
(Instituto Tecnológico de Costa Rica, 2017)
The purpose of this study is to improve and strengthen the cost control system of Grupo Condeco Vac S.A. The development starts with an analysis of the actual situation of the company this was generated with a compilation ...