Buscar
Mostrando ítems 1-10 de 41
Análisis de productividad en procesos de armadura en el proyecto The IVY de la empresa Edica Ltda
(Instituto Tecnológico de Costa Rica, 2016)
The following briefing introduces a collaborative improvement to the activities and processes used at Edica Ltda, to the production of armor for reinforced concrete elements. In order to achieve this goal, the building ...
Inspección y seguimiento del proyecto Sede de área de Salud de Barva de Heredia desarrollado por la Caja Costarricense de Seguro Social.
(Instituto Tecnológico de Costa Rica, 2016)
This report of the professional practice shows a
proposal of an improvement in the inspection
process in the area of Direction of Architecture
and Engineering (DAI) of Caja Costarricense de
Seguro Social in their ...
Aplicación de los códigos QR en el control de bodegas
(Instituto Tecnológico de Costa Rica, 2016)
6
The project will involve the implementation of the QR code in the construction industry by applying it to the administration and control of wine.
The QR code (quick response code, for its acronym in English, quick ...
Evaluación de la vulnerabilidad sísmica en viviendas y edificios comerciales menores en el área central de Pérez Zeledón, Costa Rica
(Instituto Tecnológico de Costa Rica, 2016)
The main purpose of this project is the realization of an engineering study that will serve to determine and publicize the seismic hazard in the canton of Pérez Zeledón, as well as the different levels of seismic vulnerability ...
Análisis comparativo entre pavimento flexible y rígido para uso en ruta cantonal de El Guarco
(Instituto Tecnológico de Costa Rica, 2016)
The purpose of this project is to select the kind of pavement to be built on a road of Rural Road Network of El Guarco, Cartago. The options to analyze are flexible pavement and rigid pavement.
In both cases, pavement ...
Comparación de las estructuras de pavimento rígido y flexible por medio de un análisis de ciclo de vida, enfocado a carreteras de tránsito pesado
(Instituto Tecnológico de Costa Rica., 2016)
This project aims to perform a comparison between rigid pavement and flexible pavement, applied to the case of the recently completed road Cañas-Liberia, through a life cycle analysis. Within this analysis, the initial ...
Estudio de productividad en la instalación de paredes livianas y repello en paredes de concreto armado del Nuevo Edificio de Residencias del TEC
(Instituto Tecnológico de Costa Rica, 2016)
The research aims, collect reliable data from the Costa Rican construction, through the study methodology of work and to generate a database that can be used for the benefit of the construction industry, the study takes ...
Ejecución de la construcción del reforzamiento del edificio del centro comercial Plaza Wong
(Instituto Tecnológico de Costa Rica, 2016)
This final graduation project entitled
"Implementation of the construction of the
reinforcement of the building of the Plaza Wong
shopping center" is an informative document
about the construction process necessary to ...
Análisis, comparación y diseño optimizado para muros de Contención
(Instituto Tecnológico de Costa Rica, 2016)
Retaining walls are structural elements used to
contain masses of soil, which are being analyzed
in this document are mainly compound of two
elements, the stem and the base plate.
There are many types and designs of ...
Análisis de algunos de los procesos constructivos para la obtención de la productividad y rendimientos en pavimentos flexibles de la Rampa Doméstica del AIJS
(Instituto Tecnológico de Costa Rica, 2016)
The subject developed in this project is the identification and analysis of the productivity and performance of the machinery involved in the construction of flexible pavements Domestic Ramp of the International Airport ...