Implementación de la metodología de planificación y control “Last Planner” en el proyecto de construcción: Unidad Productiva San Rafael
(Instituto Tecnológico de Costa Rica, 2017)
The main purpose of this project is to implement a planning and control system to improve the fulfillment of the activities that constitute a construction project for a period of 10 weeks. The Last Planner System (LPS) ...
Herramienta para la Gestión de Proyecto desde la Perspectiva de la Oficina de Ingeniería
(Instituto Tecnológico de Costa Rica, 2016)
According to the problems identified in the Office
of Engineering Technology of Costa Rica, in the
work of project control, it took place this
Professional Practice in order to identify
weaknesses facing and propose a ...
Aplicaciones de aeronaves no tripuladas en el control de avance de obras civiles.
(Instituto Tecnológico de Costa Rica, 2017)
The purpose of this research is to create a
methodology that facilitates and speed up the
collection of data in order to quantifiably determine
the progress of construction work, through the use
of drones and commercial ...
Monitoreo y control de la aplicación del procedimiento 8P02 Proyectos y adecuación de espacios del sistema de Gestión de Calidad de Los Arallanes S.A, según la norma ISO 9001 – 2015, en los procesos constructivos.
(Instituto Tecnológico de Costa Rica, 2018)
Quality management and the implementation of project management in construction companies are key for success, since it proves that the industry can generate products and / or services that meet customer requirements. ...
Control de costos en edificio de tres niveles
(Instituto Tecnológico de Costa Rica, 2017)
The purpose of this study is to improve and strengthen the cost control system of Grupo Condeco Vac S.A. The development starts with an analysis of the actual situation of the company this was generated with a compilation ...
Guía para procedimientos de trámite de permisos en proyectos infraestructura hospitalaria para la CCSS
(Instituto Tecnológico de Costa Rica, 2012)
The construction of hospital infrastructures represents a great challenge from the planning stage, execution, pursuit, control and closes, since interdisciplinary equipment like doctors, architects, engineers and other ...
Plan de Gestión de Riesgos Proyecto Hidroeléctrico Capulín-San Pablo
(Instituto Tecnológico de Costa Rica, 2015)
This document corresponds to the development of a risk management plan for the Hydroelectric Project Capulín - San Pablo. Through which the current situation of the company in risk management was analyzed in order to ...
Factores que afectan la construcción de alcantarillado sanitario para la Constructora Fernández Vaglio S.A.
(Instituto Tecnológico de Costa Rica, 2018)
The work presented below is based on the determination of factors that affect the construction of a sanitary pipeline project, to propose tools and methods to be able to reduce the elements identified to the maximum. To ...
Mejoramiento de los procesos de mantenimiento y control de calidad en la infraestructura de los recintos portuarios del Incop, particularmente Caldera
(Instituto Tecnológico de Costa Rica, 2015)
The present project proposes an alternative to improve and facilitate the inspection works done at Instituto Costarricense de Puertos del Pacífico (Costa Rican Institute of Pacific Ocean Ports). This will be achieved through ...
Plan de Gestión para la Ejecución de Proyectos de Vivienda de la empresa Servicios Técnicos para la Construcción Quepos S.A.
(Instituto Tecnológico de Costa Rica, 2014)
El presente proyecto abarca la realización de un manual de gestión en las áreas de integración, alcance, costo, tiempo y adquisiciones para la empresa Servicios Técnicos de la Construcción S. A.
Como base del proyecto se ...