Buscar
Mostrando ítems 21-25 de 25
Control de costos en edificio de tres niveles
(Instituto Tecnológico de Costa Rica, 2017)
The purpose of this study is to improve and strengthen the cost control system of Grupo Condeco Vac S.A. The development starts with an analysis of the actual situation of the company this was generated with a compilation ...
Guía para procedimientos de trámite de permisos en proyectos infraestructura hospitalaria para la CCSS
(Instituto Tecnológico de Costa Rica, 2012)
The construction of hospital infrastructures represents a great challenge from the planning stage, execution, pursuit, control and closes, since interdisciplinary equipment like doctors, architects, engineers and other ...
Plan de Gestión de Riesgos Proyecto Hidroeléctrico Capulín-San Pablo
(Instituto Tecnológico de Costa Rica, 2015)
This document corresponds to the development of a risk management plan for the Hydroelectric Project Capulín - San Pablo. Through which the current situation of the company in risk management was analyzed in order to ...
Factores que afectan la construcción de alcantarillado sanitario para la Constructora Fernández Vaglio S.A.
(Instituto Tecnológico de Costa Rica, 2018)
The work presented below is based on the determination of factors that affect the construction of a sanitary pipeline project, to propose tools and methods to be able to reduce the elements identified to the maximum. To ...
Guía Integrada de Gestión de Calidad en Proyectos para la Unidad de Casos Individuales de la Fundación Promotora de Vivienda (FUPROVI)
(Instituto Tecnológico de Costa Rica, 2019)
Este documento presenta el informe final del
proyecto de graduación para optar por el título de
Licenciatura en Ingeniería en Construcción, este
consistió en la creación de una Guía Integrada de
Gestión de Calidad para ...