Licenciatura en Ingeniería en Construcción: Recent submissions
Now showing items 261-280 of 563
-
Modelo estructural calibrado y análisis dinámico del Edificio Central del Instituto Costarricense de Electricidad
(Instituto Tecnológico de Costa Rica, 2017)The building that serves as the headquarters of the Costa Rican Institute of Electricity (ICE, for its initials in Spanish) was built between 1969 and 1972. Due to its 40 plus years of service life, and the lack of a ... -
Comparación del comportamiento sismo-resistente en puentes viga simple de acero con uso de aisladores de base con y sin núcleo de plomo
(Instituto Tecnológico de Costa Rica, 2017)In the following document, a series of stages and procedures are going to be developed to analyze and compare the current and possible behavior of bridges to the effect of seismic excitations, through possible modifications ... -
Comportamiento de la resistencia a la compresión axial del microconcreto para modelos a escala reducida
(Instituto Tecnológico de Costa Rica, 2018)The following study shows the corresponding results of making microconcrete mixtures in cylinders on a reduced scale, using three different water-cement ratios (0,4; 0,5; 0,6), four percentages of aggregate (20%, 30%, 40% ... -
Plan de evaluación y urgencia de intervención a estructuras de acero de soporte y pasarelas de acceso en una Planta Productora de Agregados aplicando la metodología simplificada mediante el Índice de Daño Estructural
(Instituto Tecnológico de Costa Rica, 2017)The objective of this project was to carry out an assessment of the support structures and access walkways (both of them made out of steel), of 13 conveyors of the secondary plant inside the main plant of aggregates located ... -
Análisis de la productividad y rendimiento de la mano de obra para algunas actividades constructivas del sistema electromecánico en Torres de Parqueo UCR
(Instituto Tecnológico de Costa Rica, 2017)The objective in the development of this graduation project is to establish the performance and productivities of the labor in constructive activities of the electromechanical part in charge of the company CMC contratista ... -
Aplicaciones de aeronaves no tripuladas en el control de avance de obras civiles.
(Instituto Tecnológico de Costa Rica, 2017)The purpose of this research is to create a methodology that facilitates and speed up the collection of data in order to quantifiably determine the progress of construction work, through the use of drones and commercial ... -
Evaluación y clasificación de patologías que influyen en la vida útil de las losas de concreto en puentes.
(Instituto Tecnológico de Costa Rica, 2017)Determining the service life of bridges depends on the type of structure, materials and applied loads. It is a complicated subject that requires a detailed analysis that involves all these factors. In this case, the problem ... -
Propuesta de mejoramiento de procesos constructivos en la construcción del Centro Nacional de Congresos y Convenciones
(Instituto Tecnológico de Costa Rica, 2017)The developed theme was the measurement of productivity and its yields in construction processes of the National Center of Congress and Conventions, and the search of a good plan to get improvements. The main objective was ... -
Evaluación de parámetros de sostenibilidad en proyectos de vivienda de interés social. Análisis del Conjunto Residencial El Porvenir, Matina.
(Instituto Tecnológico de Costa Rica, 2017)This document establishes an evaluation mechanism in terms of sustainability, applicable to projects of social housing or low cost home buildings. The methodology is chosen after the comparison of several characteristics ... -
Análisis de algunos de los procesos constructivos para la obtención de la productividad y rendimientos en pavimentos flexibles de la Rampa Doméstica del AIJS
(Instituto Tecnológico de Costa Rica, 2016)The subject developed in this project is the identification and analysis of the productivity and performance of the machinery involved in the construction of flexible pavements Domestic Ramp of the International Airport ... -
Implementación de la metodología de planificación y control “Last Planner” en el proyecto de construcción: Unidad Productiva San Rafael
(Instituto Tecnológico de Costa Rica, 2017)The main purpose of this project is to implement a planning and control system to improve the fulfillment of the activities that constitute a construction project for a period of 10 weeks. The Last Planner System (LPS) ... -
Estudio de Vidrio Reciclado como componente para la Elaboración de Cementos Terciarios
(Instituto Tecnológico de Costa Rica, 2017)With cement production accounting for approximately 9% of the industrial production of greenhouse gases, and in order to generate alternative cementitious materials, this project presents the results of research aimed at ... -
Zonificación y caracterización geotécnica de los suelos de la sede central del Instituto Tecnológico de Costa Rica
(Instituto Tecnológico de Costa Rica, 2017)The present investigation comprises a progressive development of different stages that begin with the compilation and analysis of geotechnical studies of the buildings of the headquarters of Technoligical of Costa Rica. ... -
Aplicación de los códigos QR en el control de bodegas
(Instituto Tecnológico de Costa Rica, 2016)6 The project will involve the implementation of the QR code in the construction industry by applying it to the administration and control of wine. The QR code (quick response code, for its acronym in English, quick ... -
Aplicación de Lean Construction a través de la metodología Last Planner a proyectos de vivienda social de FUPROVI
(Instituto Tecnológico de Costa Rica, 2017)The present paper consists on the final report of the graduation project, which consisted on designing the procedure for the application of Last Planner System® (LPS) and perform a pilot application on a project under ... -
Análisis comparativo entre pavimento flexible y rígido para uso en ruta cantonal de El Guarco
(Instituto Tecnológico de Costa Rica, 2016)The purpose of this project is to select the kind of pavement to be built on a road of Rural Road Network of El Guarco, Cartago. The options to analyze are flexible pavement and rigid pavement. In both cases, pavement ... -
Medición y mejoramiento de la productividad en la colocación de obra falsa, el montaje de elementos prefabricados y colado de entrepiso del condominio vertical residencial Q-BO
(Instituto Tecnológico de Costa Rica, 2016)This project consist was conducted in the building of the vertical residence condominium Q-BO, in charge of the construction company “HSolís”, which has more than 20 levels of apartments and an outbuilding to be used for ... -
Guía de gestión de la calidad para los proyectos constructivos de la empresa Navarro y Avilés S.A.
(Instituto Tecnológico de Costa Rica, 2017)In this paper the project to opt for the Construction Engineering Licenciature grade at Instituto Tecnológico de Costa Rica is presented, under the modality of directed professional practice, carried out in Navarro y ... -
Metodología de diseño para concretos permeables y sus respectivas correlaciones de permeabilidad
(Instituto Tecnológico de Costa Rica, 2017)This project sought to propose a methodology for the design of pervious hydraulic concrete, based on a study of existing design methodologies in other latitudes, where several points were rescued, while others were identified ... -
Ejecución de la construcción del reforzamiento del edificio del centro comercial Plaza Wong
(Instituto Tecnológico de Costa Rica, 2016)This final graduation project entitled "Implementation of the construction of the reinforcement of the building of the Plaza Wong shopping center" is an informative document about the construction process necessary to ...