Aplicaciones de aeronaves no tripuladas en el control de avance de obras civiles.
(Instituto Tecnológico de Costa Rica, 2017)The purpose of this research is to create a methodology that facilitates and speed up the collection of data in order to quantifiably determine the progress of construction work, through the use of drones and commercial ... -
Aplicación de Lean Construction a través de la metodología Last Planner a proyectos de vivienda social de FUPROVI
(Instituto Tecnológico de Costa Rica, 2017)The present paper consists on the final report of the graduation project, which consisted on designing the procedure for the application of Last Planner System® (LPS) and perform a pilot application on a project under ... -
Control de costos en edificio de tres niveles
(Instituto Tecnológico de Costa Rica, 2017)The purpose of this study is to improve and strengthen the cost control system of Grupo Condeco Vac S.A. The development starts with an analysis of the actual situation of the company this was generated with a compilation ... -
Diseño de un modelo para el control de costos reales de una construcción
(Instituto Tecnológico de Costa Rica, 2002)The purpose of this work was to establish a procedure that allows the user to have all the information about the actual costs for one or more construction projects accurately and on time. It also pretends to minimize the ... -
Diseño de un plan de gestión de calidad e inspección en la construcción de subestaciones eléctricas
(Instituto Tecnológico de Costa Rica, 2011)This document contains the design of a System of Quality Control and Inspection in the Construction of Electrical Substations for the Instituto Costarricense de Electricidad, especially for Strategic Business Unit ... -
Ejecución de la construcción del reforzamiento del edificio del centro comercial Plaza Wong
(Instituto Tecnológico de Costa Rica, 2016)This final graduation project entitled "Implementation of the construction of the reinforcement of the building of the Plaza Wong shopping center" is an informative document about the construction process necessary to ... -
Factores que afectan la construcción de alcantarillado sanitario para la Constructora Fernández Vaglio S.A.
(Instituto Tecnológico de Costa Rica, 2018)The work presented below is based on the determination of factors that affect the construction of a sanitary pipeline project, to propose tools and methods to be able to reduce the elements identified to the maximum. To ... -
Guía de gestión de la calidad para los proyectos constructivos de la empresa Navarro y Avilés S.A.
(Instituto Tecnológico de Costa Rica, 2017)In this paper the project to opt for the Construction Engineering Licenciature grade at Instituto Tecnológico de Costa Rica is presented, under the modality of directed professional practice, carried out in Navarro y ... -
Guía Integrada de Gestión de Calidad en Proyectos para la Unidad de Casos Individuales de la Fundación Promotora de Vivienda (FUPROVI)
(Instituto Tecnológico de Costa Rica, 2019)Este documento presenta el informe final del proyecto de graduación para optar por el título de Licenciatura en Ingeniería en Construcción, este consistió en la creación de una Guía Integrada de Gestión de Calidad para ... -
Guía para procedimientos de trámite de permisos en proyectos infraestructura hospitalaria para la CCSS
(Instituto Tecnológico de Costa Rica, 2012)The construction of hospital infrastructures represents a great challenge from the planning stage, execution, pursuit, control and closes, since interdisciplinary equipment like doctors, architects, engineers and other ... -
Herramienta para la Gestión de Proyecto desde la Perspectiva de la Oficina de Ingeniería
(Instituto Tecnológico de Costa Rica, 2016)According to the problems identified in the Office of Engineering Technology of Costa Rica, in the work of project control, it took place this Professional Practice in order to identify weaknesses facing and propose a ... -
Implementación de la filosofía Lean en la producción de concreto con autohormigonera
(Instituto Tecnológico de Costa Rica, 2017)The following investigation seeks the Lean philosophy implementation on the concrete production process with a self-propelled mixer, developing a methodology that involves Lean tools. At the beginning, the necessary ... -
Implementación de la metodología de planificación y control “Last Planner” en el proyecto de construcción: Unidad Productiva San Rafael
(Instituto Tecnológico de Costa Rica, 2017)The main purpose of this project is to implement a planning and control system to improve the fulfillment of the activities that constitute a construction project for a period of 10 weeks. The Last Planner System (LPS) ... -
Implementación del software O4B en la gestión de control de proyectos en la Unidad Técnica de Gestión Vial de la Municipalidad de Osa
(Instituto Tecnológico de Costa Rica, 2017)The implementation project of the Open for Business software "O4B" in the Municipality of Osa consists of applying this program in the control of road projects, using information from the projects that were being executed, ... -
Inspección y seguimiento del proyecto Sede de área de Salud de Barva de Heredia desarrollado por la Caja Costarricense de Seguro Social.
(Instituto Tecnológico de Costa Rica, 2016)This report of the professional practice shows a proposal of an improvement in the inspection process in the area of Direction of Architecture and Engineering (DAI) of Caja Costarricense de Seguro Social in their ... -
Mejora del control de costos de una empresa dedicada a movimientos de tierra y obras de infraestructura
(Instituto Tecnológico de Costa Rica, 2006)Una empresa dedicada a movimientos de tierra y construcción de obras de infraestructura, que cuenta con maquinaria pesada y equipo menor propio, busca mejorar su sistema de control de costos. Tomando como base el ... -
Mejoramiento de los procesos de mantenimiento y control de calidad en la infraestructura de los recintos portuarios del Incop, particularmente Caldera
(Instituto Tecnológico de Costa Rica, 2015)The present project proposes an alternative to improve and facilitate the inspection works done at Instituto Costarricense de Puertos del Pacífico (Costa Rican Institute of Pacific Ocean Ports). This will be achieved through ... -
Metodología para la administración de los materiales de la Constructora Adelante Desarrollos S.A.
(Instituto Tecnológico de Costa Rica, 2017)The following report presents a proposal of improvement to the administration and use of the materials in the construction Company Adelante Desarrollos S.A. We choose three types of housing as an object of study, which ... -
Monitoreo y control de la aplicación del procedimiento 8P02 Proyectos y adecuación de espacios del sistema de Gestión de Calidad de Los Arallanes S.A, según la norma ISO 9001 – 2015, en los procesos constructivos.
(Instituto Tecnológico de Costa Rica, 2018)Quality management and the implementation of project management in construction companies are key for success, since it proves that the industry can generate products and / or services that meet customer requirements. ... -
Plan de Gestión de Calidad en el Proyecto Aporte la Flor del Proyecto Hidroeléctrico Toro 3 utilizando la guía PMI
(Instituto Tecnológico de Costa Rica, 2012)The present paper was performed under the Directed Professional Practice mode to opt for a Degree in Construction Engineering. The project was developed in Proyecto Toro 3 ICE, in the construction of the Aporte La Flor, ...