Buscar
Mostrando ítems 1-10 de 47
Metodología para la evaluación de la seguridad estructural de puentes
(Instituto Tecnológico de Costa Rica, 2018)
The objective of the present work is to show the methodology to perform a reliability analysis in a prestressed concrete girder bridge, based on deformation data obtained from a diagnostic load test.
It was developed three ...
Estimación de demanda de tránsito en la carretera Florencio del Castillo, Costa Rica
(Instituto Tecnológico de Costa Rica, 2018)
Due to the need of updating and broadening the previous demand studies, this project aims to develop a demand study applied to the case of Florencio del Castillo road, Costa Rica. This work focuses on discovering the traffic ...
Metodología de diseño para concretos permeables y sus respectivas correlaciones de permeabilidad
(Instituto Tecnológico de Costa Rica, 2017)
This project sought to propose a methodology for the design of pervious hydraulic concrete, based on a study of existing design methodologies in other latitudes, where several points were rescued, while others were identified ...
Gestión de proyectos en la fase de planeación, control y seguimiento para la constructora TR Grupo Empresarial S.A.
(Instituto Tecnológico de Costa Rica, 2018)
The work developed consists of the intervention of the project management processes by the construction company TR Grupo Empresarial S.A. The objective is to develop a methodology for project management focused on the ...
Factores que afectan la construcción de alcantarillado sanitario para la Constructora Fernández Vaglio S.A.
(Instituto Tecnológico de Costa Rica, 2018)
The work presented below is based on the determination of factors that affect the construction of a sanitary pipeline project, to propose tools and methods to be able to reduce the elements identified to the maximum. To ...
Ejecución de la construcción del reforzamiento del edificio del centro comercial Plaza Wong
(Instituto Tecnológico de Costa Rica, 2016)
This final graduation project entitled
"Implementation of the construction of the
reinforcement of the building of the Plaza Wong
shopping center" is an informative document
about the construction process necessary to ...
Inventario e inspección de 10 puentes ubicados en las rutas cantonales de San Ramón de Alajuela
(Instituto Tecnológico de Costa Rica, 2018)
The main objective of this work is to inventory and inspect ten bridges belonging to roadways which are administered by San Ramon’s Municipal Administration. The bridges are located at San Rafael and Santiago districts. ...
Monitoreo y control de la aplicación del procedimiento 8P02 Proyectos y adecuación de espacios del sistema de Gestión de Calidad de Los Arallanes S.A, según la norma ISO 9001 – 2015, en los procesos constructivos.
(Instituto Tecnológico de Costa Rica, 2018)
Quality management and the implementation of project management in construction companies are key for success, since it proves that the industry can generate products and / or services that meet customer requirements. ...
Implementación de la metodología de planificación y control “Last Planner” en el proyecto de construcción: Unidad Productiva San Rafael
(Instituto Tecnológico de Costa Rica, 2017)
The main purpose of this project is to implement a planning and control system to improve the fulfillment of the activities that constitute a construction project for a period of 10 weeks. The Last Planner System (LPS) ...
Determinación del desempeño físico-mecánico de vigas de concreto reforzado con la implementación de cementos terciarios con vidrio reciclado
(Instituto Tecnológico de Costa Rica, 2018)
This Project sought to find the mechanical-physifical properties acdquired by reinforced concrete beams with the inclusion of vitreous material, taking into account a study since the point of view of the material like ...