Propuesta para el mejoramiento de la disponibilidad de la Línea de Producción de Pan Mecatherm 3
(Instituto Tecnológico de Costa Rica, 2015)This engineering proposal's main objective is the improvement of availability through reduced downtime through a quantitative research, based on an explanatory non-experimental approach. The following objectives are ... -
Elaboración de un Programa de Mantenimiento Preventivo basado en RCM para la Ranuradora y Molduradora en PLYCEM CONSTUSISTEMAS.
(Instituto Tecnológico de Costa Rica, 2015)The aim of this project is to improve the grooving and molding equipment availability by reducing the time spent during mechanical and electrical breakdowns. It is important to mention that proactive actions were established ... -
Diseño e Implementación de un programa de cinco eses en el Departamento de Mantenimiento de AERIS Holding Costa Rica, Gestor del Aeropuerto Internacional Juan Santamaría.
(Instituto Tecnológico de Costa Rica, 2015)The implementation of this technique was performed in the Maintenance Hangar of AERIS Holding Costa Rica, manager of the Juan Santamaria International Airport, to improve the organization and a save physical space. AERIS ... -
Diseño de un plan de mantenimiento productivo total (TPM) enfocado en el mantenimiento preventivo, mantenimiento autónomo y la eficiencia general de equipos (OEE) para los equipos más críticos de la planta FAS
(Instituto Tecnológico de Costa Rica, 2015)The project was made at FAS (Factory of Taste) company, which is the factory where the brand Spoon produces its products, this factory is located in San Francisco of Dos Rios in San Jose, Costa Rica. Factory process every ... -
Desarrollo de una auditoría energética para la granja avícola Los Alpes en Venecia de San Carlos
(Instituto Tecnológico de Costa Rica, 2015)The development of the energy audit at Los Alpes poultry farm, located in Los Alpes of Venecia, was made following the ASHREAE´S methodology. It consisted on the elaboration of the diagnosis of the farm´s energy consumption ... -
Mejora de la disponibilidad operacional de los equipos de protección de la red de transporte, mediante la implementación de un RCM
(Instituto Tecnológico de Costa Rica, 2015)Para implementar este proyecto se pretende impactar en la disponibilidad operacional de los equipos de protección mediante la elaboración de un plan de mantenimiento preventivo (PMP) basado en RCM que permita estandarizar ... -
Diseño de eficiencia energética, para el aprovechamiento de calor residual y disminución de huella carbono, en Planta Pepsi.
(Instituto Tecnológico de Costa Rica, 2015)This project was developed in the Pepsi Company located in Ulloa Heredia. The climate change is a theme of fundamental importance for the enterprises, and they seek to contribute by reducing its own carbon footprint. Pepsi ... -
Diseño mecánico del chasis de un ascensor para personas aplicando las normativas de la Ley 7600 sobre Igualdad de oportunidades para las personas con discapacidad
(Instituto Tecnológico de Costa Rica, 2015)This report was produced at AZMONTS.A to develop the mechanical design of an elevator car frame and its components, in a more productive manner, so the company can decrease costs and improve its sales. The project stems ... -
Diseño de base de datos para el análisis de rendimientos de mano de obra
(Instituto Tecnológico de Costa Rica, 2015)Productivity is the ratio between the amount of products obtained by a productive system and resources used to obtain this production. It can also be defined as the ratio between the results and the time taken to obtain ... -
Elaboración del plan de lubricación de los equipos estacionarios y especificación técnica de los lubricantes de los vehículos livianos del Plantel El Alto, Recope S.A.
(Instituto Tecnológico de Costa Rica, 2015)It is pertinent to note that the need to prolong the life of equipment and consequently, increase reliability, seeks special care to details such as lubrication. There are many mistakes and oversights associated to the low ... -
Revisar el programa de mantenimiento preventivo para encontrar oportunidades de mejora e incorporación de las bases del mantenimiento autónomo como introducción al TPM
(Instituto Tecnológico de Costa Rica, 2015)The manufacture of high precision components requires highly efficient staff and machinery. Oberg machines have the ability to create parts with tolerances of the order of millionths of an inch. However, the maintenance ... -
Implementación de un plan piloto de TPM en la llenadora de puré de banano
(Instituto Tecnológico de Costa Rica, 2015)Frutilight is a new plant whose main goal is to produce and always provide reliable products of high quality and safety benefit stakeholders and making the best working conditions and ongoing training to human resources. This ... -
Rediseño del sistema de refrigeración para almacenamiento de producto congelado
(Instituto Tecnológico de Costa Rica, 2015)Currently, the company Caminos del Sol S.A. has two frozen warehouses which store the products once they have been processed. In the last years, the company has had an increase in production levels, which is why the two ... -
Diseño de planta de verificación del rendimiento de paneles fotovoltaicos basado en “Photovoltaic Performance Verification Program", del Kortright Center
(Instituto Tecnológico de Costa Rica, 2015)El proyecto consiste en el diseño de una instalación fotovoltaica para estudiar el rendimiento de distintas marcas de paneles solares bajo condiciones de operación reales en la zona tropical, publicando reportes mensuales ... -
Modelo de gestión energética en el Hotel Condovac la Costa
(Instituto Tecnológico de Costa Rica, 2015)This project has as objective designing and implementing an energy management model applied to Hotel Condovac La Costa electrical area, where the monthly power consumption is reduced, making rational and efficient use of ... -
Justificación de la sustitución de una caldera de bunker por una caldera de biomasa por Eco Solutions en Bridgestone de Costa Rica.
(Instituto Tecnológico de Costa Rica, 2014)La justificación de la sustitución de una caldera de bunker por una caldera de biomasa en Bridgestone de Costa Rica es el objetivo de la oficina de ambiente, ingeniería y proyectos en conjunto con Eco Solutions. Se necesita ... -
Estudio del sistema de aire acondicionado en el recinto de moldeo de la empresa Panduit Costa Rica
(Instituto Tecnológico de Costa Rica, 2014)El presente estudio descriptivo con enfoque cuantitativo tiene como propósito fundamental justificar el cambio de equipo de aire acondicionado (RTU-2A) que funciona actualmente en Panduit Costa Rica, con base en un diagnóstico ... -
Desarrollo de un plan de mantenimiento preventivo basado en la metodología RCM para el departamento de patio de caña
(Instituto Tecnológico de Costa Rica, 2014)Utilizando como guía la metodología del mantenimiento centrado en confiabilidad (RCM) se desarrolla el presente estudio para mejorar la disponibilidad del Ingenio Central Azucarera del Tempisque S.A. (CATSA), mediante el ... -
Rediseño de los sistemas eléctricos de emergencia del hospital Dr. Carlos Luis Valverde Vega (HCLVV) acorde con el Código Eléctrico Nacional y la Norma NFPA (National Fire Protection Association)
(Instituto Tecnológico de Costa Rica, 2014)Se le llama instalación eléctrica al conjunto de elementos que permiten transportar y distribuir la energía eléctrica desde el punto de suministro hasta los equipos que la utilizan. Entre estos elementos se incluyen: ... -
Evaluación y mejora del sistema de aire comprimido de la planta de fibrocemento Plycem
(Instituto Tecnológico de Costa Rica, 2014)El proyecto de evaluación del sistema de aire comprimido de la planta Plycem se completó con el objetivo de disminuir el consumo energético que representa este sistema para la empresa. En todo el proceso de fabricación ...