Buscar
Mostrando ítems 1-10 de 22
Revisar el programa de mantenimiento preventivo para encontrar oportunidades de mejora e incorporación de las bases del mantenimiento autónomo como introducción al TPM
(Instituto Tecnológico de Costa Rica, 2015)
The manufacture of high precision components requires highly efficient staff and machinery. Oberg machines have the ability to create parts with tolerances of the order of millionths of an inch. However, the maintenance ...
Modelo de gestión energética en el Hotel Condovac la Costa
(Instituto Tecnológico de Costa Rica, 2015)
This project has as objective designing and implementing an energy management model applied to Hotel Condovac La Costa electrical area, where the monthly power consumption is reduced, making rational and efficient use of ...
Diseño mecánico del chasis de un ascensor para personas aplicando las normativas de la Ley 7600 sobre Igualdad de oportunidades para las personas con discapacidad
(Instituto Tecnológico de Costa Rica, 2015)
This report was produced at AZMONTS.A to develop the mechanical design of an elevator car frame and its components, in a more productive manner, so the company can decrease costs and improve its sales.
The project stems ...
Elaboración de un Programa de Mantenimiento Preventivo basado en RCM para la Ranuradora y Molduradora en PLYCEM CONSTUSISTEMAS.
(Instituto Tecnológico de Costa Rica, 2015)
The aim of this project is to improve the grooving and molding equipment availability by reducing the time spent during mechanical and electrical breakdowns. It is important to mention that proactive actions were established ...
Horno solar para secado de madera
(Instituto Tecnológico de Costa Rica, 2015)
Este proyecto se concibió con el fin de diseñar un horno para secar madera utilizando una energía alternativa y aprovechándola al máximo. Para esto se decidió utilizar la energía solar ya que es abundante en la zona, y ...
Diseño de un plan de mantenimiento productivo total (TPM) enfocado en el mantenimiento preventivo, mantenimiento autónomo y la eficiencia general de equipos (OEE) para los equipos más críticos de la planta FAS
(Instituto Tecnológico de Costa Rica, 2015)
The project was made at FAS (Factory of Taste) company, which is the factory where the brand Spoon produces its products, this factory is located in San Francisco of Dos Rios in San Jose, Costa Rica. Factory process every ...
Diseño de base de datos para el análisis de rendimientos de mano de obra
(Instituto Tecnológico de Costa Rica, 2015)
Productivity is the ratio between the amount of products obtained by a productive system and resources used to obtain this production. It can also be defined as the ratio between the results and the time taken to obtain ...
Rediseño del sistema de refrigeración para almacenamiento de producto congelado
(Instituto Tecnológico de Costa Rica, 2015)
Currently, the company Caminos del Sol S.A. has two frozen warehouses which store the products once they have been processed. In the last years, the company has had an increase in production levels, which is why the two ...
Diseño e Implementación de un programa de cinco eses en el Departamento de Mantenimiento de AERIS Holding Costa Rica, Gestor del Aeropuerto Internacional Juan Santamaría.
(Instituto Tecnológico de Costa Rica, 2015)
The implementation of this technique was performed in the Maintenance Hangar of AERIS Holding Costa Rica, manager of the Juan Santamaria International Airport, to improve the organization and a save physical space. AERIS ...
Elaboración del plan de lubricación de los equipos estacionarios y especificación técnica de los lubricantes de los vehículos livianos del Plantel El Alto, Recope S.A.
(Instituto Tecnológico de Costa Rica, 2015)
It is pertinent to note that the need to prolong the life of equipment and consequently, increase reliability, seeks special care to details such as lubrication. There are many mistakes and oversights associated to the low ...